How do you prepare cabinets before painting?
Scuff sanding prepares the cabinet surface after cleaning and before primer and paint. We remove hardware, degrease the surfaces, check doors and frames for damage, and complete repairs included in the agreed scope. Bonding primer then creates a suitable base for the finish coat. Thomas J. Painting reviews the cabinet layout during the free consultation before setting the work agreement.
What cabinet parts should be included in the work scope?
The work scope should identify doors, drawer fronts, frames, end panels, hardware, and related millwork. Each part can have a different condition and access need. We review those surfaces during the in-home meeting, then explain which repairs, protection steps, painting tasks, and cleanup belong in the agreement.
Which household steps help before the crew starts?
Clear cabinet contents and discuss access needs before the scheduled work begins. Remove food, dishes, and personal items from the cabinets and nearby counters. We protect floors and surrounding surfaces with floor paper, plastic, or carpet coverings. The consultation also gives us a chance to discuss hardware, work areas, and items that should remain accessible.
Why can cabinet painting cost more after the first inspection?
Hidden grease, loose coatings, damaged edges, and added cabinet parts can expand the agreed preparation scope. The cabinet condition, hardware, repairs, protection, and finish requirements all affect the quote. We review those factors before developing an agreement, so the proposed work reflects the surfaces that need attention.
When does refacing make more sense than painting?
Refacing may make more sense when selected cabinet surfaces or parts need replacement, while painting suits cabinet components that remain sound. The choice depends on the doors, drawers, frames, hardware, damage, and desired layout. We discuss painting, refacing, and related carpentry during the in-home consultation before the work scope is set.
How does the final cabinet inspection work?
The final inspection reviews the painted surfaces, cabinet parts, work area, and cleanup with the lead paint crew member. We walk through the completed work and discuss any items covered by the agreement. This step gives you a direct review of the doors, drawers, frames, protection removal, and finished work area.